iApprove™
Eaton
Approval routing and workflow for QAD-integrated processes at a global power management manufacturer — replacing e-mail and spreadsheet approvals with policy-driven routing that executes directly in QAD.
This snapshot is a working draft — ISS content is still needed
Every other Project Snapshot on the site was built from a source document ISS supplied. There is no Eaton source document, so the copy below was written from the iApprove™ platform’s own material to show the layout. It is accurate to the platform, but it is not an approved Eaton case study and no figure on this page is attributed to Eaton.
- A headline for the page — every other snapshot leads with an outcome, e.g. “Eliminating the Credit Backlog with iApprove™”. This page currently shows only the company name.
- Section headlines for The Client, Challenge, Solutions, Capabilities and Results.
- A customer quote and attribution — a name, role and company.
- Result figures specific to Eaton. The one figure shown is operational scale, not an Eaton outcome.
- The process name for the metadata strip — it reads Industry / Solution / Integration, with Process missing.
- Confirmation that Eaton is happy to be named in a public case study at all.
Process requests arrived by e-mail and spreadsheet, with no single record of what had been asked for.
Approval paths depended on who was available, so routing varied case by case.
Approved requests were re-keyed into QAD by hand, introducing errors and delay.
No consolidated view of what was in flight, or where it was held up.
Approval routing and workflow for QAD-integrated processes at a global power management manufacturer — replacing e-mail and spreadsheet approvals with policy-driven routing that executes directly in QAD.
- Request
- Validate against QAD
- Route by policy
- Approve
- Execute in QAD
01Structured intake forms that validate against live QAD data at the point of entry.+
02Rules-driven routing built from QAD data, roles, thresholds and policy — not a static approver list.+
03Multi-level approvals that cross site, department and geographic boundaries.+
04Approved requests written straight to QAD, removing the re-keying step entirely.+
05Validated against live QAD data+
Requests are checked against QAD as they are entered, so incomplete or invalid data never reaches a transaction.
Manual coordination and re-keying removed from the approval process.
Consistent, policy-enforced routing applied the same way across sites.
Live visibility into in-flight requests and where they are held up.
A complete, time-stamped audit trail behind every decision.
Raw material lots supported annually within QAD-integrated workflows
Apply this workflow to your QAD processes
See how ISSG can deliver similar outcomes across your QAD-integrated processes.
